The Director of Planning approved the application on August 25, 2025, subject to conditions.  A Development Permit may be issued once all conditions have been satisfied. For more information, please see the Prior-to letter under "Application documents"


Maple Pathway Childcare Center Inc. has applied to the City of Vancouver for permission to perform interior alterations and to change the use from a single detached house to a Child Daycare Facility for up to 13 children (30 months to 5 years old), on this existing site, consisting of:

  • A floor area of approximately 3,928.0 sq.ft.
  • Hours of operation: 7:30 am to 6:00 pm, Monday to Friday

Under the site’s existing FSD zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.

Maple Pathway Childcare Center Inc. has applied to the City of Vancouver for permission to perform interior alterations and to change the use from a single detached house to a Child Daycare Facility for up to 13 children (30 months to 5 years old), on this existing site, consisting of:

  • A floor area of approximately 3,928.0 sq.ft.
  • Hours of operation: 7:30 am to 6:00 pm, Monday to Friday

Under the site’s existing FSD zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.