1616 E 22nd Ave (DP-2025-00122) development application

Share 1616 E 22nd Ave (DP-2025-00122) development application on Facebook Share 1616 E 22nd Ave (DP-2025-00122) development application on Twitter Share 1616 E 22nd Ave (DP-2025-00122) development application on Linkedin Email 1616 E 22nd Ave (DP-2025-00122) development application link

The Director of Planning approved the application on June 9, 2025, subject to conditions. A Development Permit may be issued once all conditions have been satisfied. For more information, please see the Prior-to letter under "Application documents”.

EDG Homes Inc. has applied to the City of Vancouver for permission to develop a duplex (Building 1) with an attached garage and a single detached house (Building 2) with an attached garage on this site, consisting of:

  • A total proposed Floor Space Ratio of 0.75 (approximately 4,063 sq. ft.)
  • Proposed heights of:
    • Building 1: approximately 33.35 ft. (10.2 m)
    • Building 2: approximately 22.25 ft. (6.8 m)
  • A total of three parking spaces having access from Perry Street

Under the site’s existing RT-10 zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.


The Director of Planning approved the application on June 9, 2025, subject to conditions. A Development Permit may be issued once all conditions have been satisfied. For more information, please see the Prior-to letter under "Application documents”.

EDG Homes Inc. has applied to the City of Vancouver for permission to develop a duplex (Building 1) with an attached garage and a single detached house (Building 2) with an attached garage on this site, consisting of:

  • A total proposed Floor Space Ratio of 0.75 (approximately 4,063 sq. ft.)
  • Proposed heights of:
    • Building 1: approximately 33.35 ft. (10.2 m)
    • Building 2: approximately 22.25 ft. (6.8 m)
  • A total of three parking spaces having access from Perry Street

Under the site’s existing RT-10 zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.


Page last updated: 13 Jun 2025, 09:10 AM