215 W 1st Ave text amendment

Share 215 W 1st Ave text amendment on Facebook Share 215 W 1st Ave text amendment on Twitter Share 215 W 1st Ave text amendment on Linkedin Email 215 W 1st Ave text amendment link


The City of Vancouver has received a rezoning application to­­ amend CD-1 (454) for an increase in height from 13.5 m (44 ft.) to 18.8 m (62 ft.). The existing zoning allows for Institutional uses which includes School – Elementary or Secondary. The proposal is for the development of a four-storey elementary school building, which­ includes:

  • 6,000 sq. m (64,583 sq. ft.) for instructional areas including classrooms, gymnasium, and community facilities to accommodate 630 students;
  • An activated rooftop space;
  • A floor space ratio (FSR) of 3.0; and
  • A building height of 18.8 m (62 ft.).

This application is being considered under the Southeast False Creek Official Development Plan

Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.


Announcement

(September 2025)

The rezoning application has recieved an addition:

  • To better accommodate outdoor play space that will support the Olympic Village School, the Vancouver Board of Education (VBE) and the City of Vancouver (CoV) are negotiating an access agreement and improvements to the portion of Hinge Park outlined in red. The agreement and the associated improvements are anticipated to be established as a condition of the rezoning.
  • These improvements are intended to meet the needs of the school during school hours, and invest in the park for use by the public.
  • The improvements of this area will be to the satisfaction of the Park Board.
  • The approximate area is 18,000 sq. ft.
  • The Official Development Plan for Southeast False Creek provides for additional greenspace to be provided to the west of Olympic Village School (also known as Site 1A). A Map of Site 1A is noted below.
  • There is currently no timeline for redevelopment of Site 1A, however, a considerable waterfront park will be part of the eventual phased development.

The applicant has submitted a Transportation Assessment and Management Study (TAMS) as part of the application. The document is available for public review under the Application Documents tab.




The City of Vancouver has received a rezoning application to­­ amend CD-1 (454) for an increase in height from 13.5 m (44 ft.) to 18.8 m (62 ft.). The existing zoning allows for Institutional uses which includes School – Elementary or Secondary. The proposal is for the development of a four-storey elementary school building, which­ includes:

  • 6,000 sq. m (64,583 sq. ft.) for instructional areas including classrooms, gymnasium, and community facilities to accommodate 630 students;
  • An activated rooftop space;
  • A floor space ratio (FSR) of 3.0; and
  • A building height of 18.8 m (62 ft.).

This application is being considered under the Southeast False Creek Official Development Plan

Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.


Announcement

(September 2025)

The rezoning application has recieved an addition:

  • To better accommodate outdoor play space that will support the Olympic Village School, the Vancouver Board of Education (VBE) and the City of Vancouver (CoV) are negotiating an access agreement and improvements to the portion of Hinge Park outlined in red. The agreement and the associated improvements are anticipated to be established as a condition of the rezoning.
  • These improvements are intended to meet the needs of the school during school hours, and invest in the park for use by the public.
  • The improvements of this area will be to the satisfaction of the Park Board.
  • The approximate area is 18,000 sq. ft.
  • The Official Development Plan for Southeast False Creek provides for additional greenspace to be provided to the west of Olympic Village School (also known as Site 1A). A Map of Site 1A is noted below.
  • There is currently no timeline for redevelopment of Site 1A, however, a considerable waterfront park will be part of the eventual phased development.

The applicant has submitted a Transportation Assessment and Management Study (TAMS) as part of the application. The document is available for public review under the Application Documents tab.



Page last updated: 17 Sep 2025, 02:50 PM