2525 York Ave (DP-2023-00173) development application
Share 2525 York Ave (DP-2023-00173) development application on FacebookShare 2525 York Ave (DP-2023-00173) development application on TwitterShare 2525 York Ave (DP-2023-00173) development application on LinkedinEmail 2525 York Ave (DP-2023-00173) development application link
The Director of Planning approved this application, and a Development Permit was issued on July 9, 2025.
Eric Stine Architect Inc. has applied to the City of Vancouver for permission to alter and convert this existing Multiple Conversion Dwelling to a Duplex with alteration to the existing four car detached garage at the rear consisting of:
A proposed height of approximately 36.30 ft./ 11.00 m for the Duplex
A proposed Floor Space Ratio of 0.89 for the site (approximately 5,330 sq.ft.)
Under the site’s existing RT-8 zoning(External link), the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.
Review of design guidelines applicable to one and two family dwellings in this district has been streamlined, as per the Council report(External link) of June 8, 2021, as a temporary measure for one year. On June 7, 2022, Council extended the streamlined review process for an additional two years.
The Director of Planning approved this application, and a Development Permit was issued on July 9, 2025.
Eric Stine Architect Inc. has applied to the City of Vancouver for permission to alter and convert this existing Multiple Conversion Dwelling to a Duplex with alteration to the existing four car detached garage at the rear consisting of:
A proposed height of approximately 36.30 ft./ 11.00 m for the Duplex
A proposed Floor Space Ratio of 0.89 for the site (approximately 5,330 sq.ft.)
Under the site’s existing RT-8 zoning(External link), the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.
Review of design guidelines applicable to one and two family dwellings in this district has been streamlined, as per the Council report(External link) of June 8, 2021, as a temporary measure for one year. On June 7, 2022, Council extended the streamlined review process for an additional two years.