3336 W 35th Ave (DP-2023-00614) development application
Share 3336 W 35th Ave (DP-2023-00614) development application on FacebookShare 3336 W 35th Ave (DP-2023-00614) development application on TwitterShare 3336 W 35th Ave (DP-2023-00614) development application on LinkedinEmail 3336 W 35th Ave (DP-2023-00614) development application link
The Director of Planning approved this application, and a Development Permit was issued on December 12, 2024.
D.V. Design Ltd has applied to the City of Vancouver for permission to develop on this site:
Two storey Single Detached House with a detached accessory building (three-car garage), having vehicular access from the lane.
A total height of approximately 32 ft.
A total floor space ratio of 0.7 (approximately 4,500 sq. ft.)
Under the site’s existing R1-1 zoning (previously RS-5), the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.
Review of design guidelines applicable to one and two family dwellings in this district has been streamlined, as per the Council report of June 8, 2021, as a temporary measure for one year. On June 7, 2022, Council extended the streamlined review process for an additional two years.
The Director of Planning approved this application, and a Development Permit was issued on December 12, 2024.
D.V. Design Ltd has applied to the City of Vancouver for permission to develop on this site:
Two storey Single Detached House with a detached accessory building (three-car garage), having vehicular access from the lane.
A total height of approximately 32 ft.
A total floor space ratio of 0.7 (approximately 4,500 sq. ft.)
Under the site’s existing R1-1 zoning (previously RS-5), the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.
Review of design guidelines applicable to one and two family dwellings in this district has been streamlined, as per the Council report of June 8, 2021, as a temporary measure for one year. On June 7, 2022, Council extended the streamlined review process for an additional two years.