3336 W 35th Ave (DP-2023-00614) development application

Share 3336 W 35th Ave (DP-2023-00614) development application on Facebook Share 3336 W 35th Ave (DP-2023-00614) development application on Twitter Share 3336 W 35th Ave (DP-2023-00614) development application on Linkedin Email 3336 W 35th Ave (DP-2023-00614) development application link

The Director of Planning approved this application, and a Development Permit was issued on December 12, 2024.

D.V. Design Ltd has applied to the City of Vancouver for permission to develop on this site:

  • Two storey Single Detached House with a detached accessory building (three-car garage), having vehicular access from the lane.
  • A total height of approximately 32 ft.
  • A total floor space ratio of 0.7 (approximately 4,500 sq. ft.)

Under the site’s existing R1-1 zoning (previously RS-5), the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.

Review of design guidelines applicable to one and two family dwellings in this district has been streamlined, as per the Council report of June 8, 2021, as a temporary measure for one year. On June 7, 2022, Council extended the streamlined review process for an additional two years.

The Director of Planning approved this application, and a Development Permit was issued on December 12, 2024.

D.V. Design Ltd has applied to the City of Vancouver for permission to develop on this site:

  • Two storey Single Detached House with a detached accessory building (three-car garage), having vehicular access from the lane.
  • A total height of approximately 32 ft.
  • A total floor space ratio of 0.7 (approximately 4,500 sq. ft.)

Under the site’s existing R1-1 zoning (previously RS-5), the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.

Review of design guidelines applicable to one and two family dwellings in this district has been streamlined, as per the Council report of June 8, 2021, as a temporary measure for one year. On June 7, 2022, Council extended the streamlined review process for an additional two years.

Page last updated: 10 Feb 2025, 03:34 PM