The Director of Planning approved the application on April 27, 2023, subject to conditions.  A Development Permit may be issued once all conditions have been satisfied. For more information, please see the Prior-to letter under "Application documents"


Architectural Collective has applied to the City of Vancouver for permission to develop the following on this site:

  • To add, alter and convert the existing character one-family dwelling to a Multiple Conversion Dwelling (Building 1) containing two dwelling units, consisting of:
    • A total height of approximately 33 ft.
    • A total Floor Space Ratio of 0.32 (approximately 3,000 sq. ft.)
  • To develop two Infill Duplex dwellings (Building 2 and Building 3) at the middle and rear portion of this site, consisting of:
    • A total height of approximately 24 ft. for each building
    • A total Floor Space Ratio of 0.26 (approximately 2,500 sq. ft.) for each building
  • Five parking spaces provided, having vehicular access from the lane

Under the site’s existing RS-1 zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.

Architectural Collective has applied to the City of Vancouver for permission to develop the following on this site:

  • To add, alter and convert the existing character one-family dwelling to a Multiple Conversion Dwelling (Building 1) containing two dwelling units, consisting of:
    • A total height of approximately 33 ft.
    • A total Floor Space Ratio of 0.32 (approximately 3,000 sq. ft.)
  • To develop two Infill Duplex dwellings (Building 2 and Building 3) at the middle and rear portion of this site, consisting of:
    • A total height of approximately 24 ft. for each building
    • A total Floor Space Ratio of 0.26 (approximately 2,500 sq. ft.) for each building
  • Five parking spaces provided, having vehicular access from the lane

Under the site’s existing RS-1 zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.