3757 Fleming St (DP-2021-00902) development application

Share 3757 Fleming St (DP-2021-00902) development application on Facebook Share 3757 Fleming St (DP-2021-00902) development application on Twitter Share 3757 Fleming St (DP-2021-00902) development application on Linkedin Email 3757 Fleming St (DP-2021-00902) development application link

The Director of Planning approved this application, and a Development Permit was issued on October 7, 2022.


Kennix Development has applied to the City of Vancouver for permission to develop two-storey, one-family dwelling with a secondary suite with a detached accessory building at the rear, consisting of:

  • A proposed height of approximately 24.70 ft. / 7.5 m
  • A proposed Floor Space Ratio of 0.6 for the site (approximately 1,590 sq.ft. / 147.7 m²)
  • Three vehicle parking spaces (two with the detached garage and one surface car parking space), having access from the lane

Under the site’s existing RT-10 zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.

Review of design guidelines applicable to one and two family dwellings in this district has been streamlined as per the Council report of June 8, 2021. This is a temporary measure for one year.

Kennix Development has applied to the City of Vancouver for permission to develop two-storey, one-family dwelling with a secondary suite with a detached accessory building at the rear, consisting of:

  • A proposed height of approximately 24.70 ft. / 7.5 m
  • A proposed Floor Space Ratio of 0.6 for the site (approximately 1,590 sq.ft. / 147.7 m²)
  • Three vehicle parking spaces (two with the detached garage and one surface car parking space), having access from the lane

Under the site’s existing RT-10 zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.

Review of design guidelines applicable to one and two family dwellings in this district has been streamlined as per the Council report of June 8, 2021. This is a temporary measure for one year.