The Director of Planning approved the application on August 14, 2025, subject to conditions. A Development Permit may be issued once all conditions have been satisfied. For more information, please see the Prior-to letter under "Application documents”


F. Adab Architects Inc. has applied to the City of Vancouver for permission to develop on this site a new four-storey mixed-use building, consisting of:

  • A total of 21 dwelling units, including two Live-Work units
  • Two retail units at ground level
  • A proposed height of 45.1 ft. (13.8 m)
  • A floor area of approximately 18,953 sq. ft. (2.46 Floor Space Ratio)
  • All over one level of underground parking, having vehicular access from the lane

Under the site’s existing C-2 zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.

F. Adab Architects Inc. has applied to the City of Vancouver for permission to develop on this site a new four-storey mixed-use building, consisting of:

  • A total of 21 dwelling units, including two Live-Work units
  • Two retail units at ground level
  • A proposed height of 45.1 ft. (13.8 m)
  • A floor area of approximately 18,953 sq. ft. (2.46 Floor Space Ratio)
  • All over one level of underground parking, having vehicular access from the lane

Under the site’s existing C-2 zoning, the application is “conditional” so it may be permitted. However, it requires the decision of the Director of Planning.