975 W 57th Ave rezoning application

Share 975 W 57th Ave rezoning application on Facebook Share 975 W 57th Ave rezoning application on Twitter Share 975 W 57th Ave rezoning application on Linkedin Email 975 W 57th Ave rezoning application link

The City of Vancouver has received an application to rezone the subject site from R1-1 (Residential Inclusive) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of the former Salvation Army Homestead and includes:

  • A 19-storey strata residential building with 143 units;
  • A 6-storey mixed-used building with 47 rental residential units and 37-space childcare;
  • A floor space ratio (FSR) of 3.04;
  • A building height of 64.4 m (211 ft.); and
  • 198 vehicle parking spaces and 374 bicycle spaces.

This application is being considered under the Cambie Corridor Plan.

This proposal previously went through the enhanced rezoning process as a unique site under the Cambie Corridor Plan. Link: https://www.shapeyourcity.ca/975-w-57th-ave

Application drawings and statistics on this webpage are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

The City of Vancouver has received an application to rezone the subject site from R1-1 (Residential Inclusive) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of the former Salvation Army Homestead and includes:

  • A 19-storey strata residential building with 143 units;
  • A 6-storey mixed-used building with 47 rental residential units and 37-space childcare;
  • A floor space ratio (FSR) of 3.04;
  • A building height of 64.4 m (211 ft.); and
  • 198 vehicle parking spaces and 374 bicycle spaces.

This application is being considered under the Cambie Corridor Plan.

This proposal previously went through the enhanced rezoning process as a unique site under the Cambie Corridor Plan. Link: https://www.shapeyourcity.ca/975-w-57th-ave

Application drawings and statistics on this webpage are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

Page last updated: 14 Mar 2024, 03:46 PM