Search results
Results with access site here PROBLEMGO.COM get out of jail before trial money
Page 12 of 20. Found 195.
2607 E 38th Ave (DP-2025-00048) development application
RAVA homes has applied to the City of Vancouver for permission to develop a two-storey triplex with a detached accessory building at the rear on this site, consisting of:A total proposed Floor Space Ratio of 0.90 for the site (approximately 3,900 sq.
Q&A
What provisions have been made to improve access to the central valley greenway bike route under the skytrain guideway and will any additional right of way or amenities be provided in the adjacent sections to the site.
Q&A
Access to amenities such as childcare was considered as part of the policy work for the Secured Rental Policy (SRP).
1248 E 22nd Ave (DP-2025-00127) development application
True Vision Construction Ltd. has applied to the City of Vancouver for permission to develop a two-storey with basement Multiple Dwelling on this site, consisting of:Four dwelling unitsA proposed Floor Space Ratio of 0.88 for the site (approximately 5,327
351 W 16th Ave (DP-2024-00229) development application
of approximately:13 total secured market rental dwelling unitsTotal Site Floor Space Ratio of 1.42 FSR (approximately 850 m² / 9,147 sq.ft.)Maximum Building Height of 11.52 m (37.8 ft.) to top of front building roof peakFour parking stalls having vehicular
1511 Barclay St (DP-2022-00822) development application
ft.)A proposed height of 39.16 ft.An accessory building (garage) at rear of the site complete with two garage parking spaces, having access from the laneUnder the site’s existing RM-5 zoning, the application is “conditional” so it may be permitted.
2743 W 29th Ave (DP-2023-00149) development application
Infill buildingA proposed Floor Space Ratio of 0.65 for the site (approximately 4,250 sq.ft.)Three vehicle parking spaces, having access from the laneUnder the site’s existing RS-1 zoning, the application is “conditional” so it may be permitted.
Q&A
It is hard to predict construction timing and this would be a question best answered by the developer but usually it takes a year or two to get through the permit processes and complete all the agreements etc. before any type of construction can
1530 E 11th Ave (DP-2022-00521) development application
an Infill Single Detached House (Building 2) at the rear of the site Three parking spaces having vehicular access from the lane Under the site’s existing RT-5 zoning, the application is “conditional” so it may be permitted.
4569 Langara Ave (DP-2023-00454) development application
by steel posts, including steel stairs to access the rear of the site, along the East side of this existing inside with lane siteUnder the site’s existing RS-1 zoning, the application is “conditional” so it may be permitted.