Search results
Results with MAKEMUR.com Need someone to make my drug charges go away for a fee HMP Five Wells
Page 4 of 20. Found 192.
W.C. Shelly Park survey: draft concept plan
, Do you think the design will meet the community need for a welcoming and safe park?, What do you think of the overall park design?, Which age group do you belong to? Select one., What do you think of the location of the proposed dog off-leash area?
The Future we Want: Youth Survey
25 February 2021 In Phase 1 of the Vancouver Plan, the community (including a diverse group of young people) told us their hopes for the future, which became our 10 Provisional Goals. Now we need you ideas about how we can make them happen!
Do you have any questions?
Associated costs with this option include a connection fee, installation of a hose bib, and the cost of infrastructure to bring the water line into the park.the survey asks about people with disabilities especially people with decreased mobility.
Q&A
When north or southbound traffic is trying to make a left or right onto Wellington, the traffic backs up for the entire block.
2585 E Hastings St (DP-2022-00678) development application
JTA Development Consultants has applied to the City of Vancouver for permission to develop a mixed-use development building, having six-storeys on this site, including:Commercial retail, restaurant, drug store, and residential usesA total of 157 Secured
Commemoration Framework survey
This means there is a need for space for people to gather as groups to remember in parks, plazas or other public spaces in ways that are important to them with their own communities and with other communities., Ensure local relevance and connection to
Zoning and Development By-law Regulatory Amendments for
Under current zoning, a development permit for TMH is limited to a maximum of five years and can be extended for up to an additional five years (for a maximum of ten years) by the Director of Planning.
Seniors Housing Strategy
Learn about the strategy in a brief summary (PDF, 1.6 MB) or read the full strategy document (PDF, 2.8 MB) and have someone translate it for you if needed.
Stay updated!
you have any questions or need help with this form, please email: indigenous.engagement@vancouver.ca Email:, Please let us know if we need to do anything to make the event accessible for you (e.g.
Ask a question
Do you have questions for us about housing in Vancouver? You can submit a question here - we will make every effort to respond within 2-3 business days.