Search results
Results with enter main site MAKEMUR.COM Paying to stop an IRS garnishment Langí Kal Kal Prison
Page 8 of 20. Found 198.
Submit your question to City staff
, an accessibility ramp leading up to the main entrance, a slopped walkway leading up to the existing playfield on the south side of the site, as well as accessible washrooms and change rooms.Will there be an opportunity to make comments?
Is there a water connection at both sites?
The South-East site has an existing water connection that would require no additional work to be useable for the garden.The North-East site has a nearby water connection that is currently inactive.
45 W 7th Ave (DP-2022-00028) development application
Francl Architecture Inc. has applied to the City of Vancouver for permission to develop a new mixed-use building containing an industrial use on the main and second storey and office use from the second to fourth storey, consisting of:A Floor Space Ratio
What past decisions have been made on this site?
to 100% social housing.
Terms of Use
MODIFICATIONS AND DISCONTINUANCE 11.1 We may change the TOU from time to time without prior notice to You, and We will indicate there is an updated TOU by posting it to the Site.
1325-1333 E Georgia St: Amendments to the regional
To allow residential use, an amendment to the by-law is required. The amendment would temporarily change the designation of this site from Industrial to General Urban, while the property is occupied with Temporary Modular Housing.
227 Main St (DP-2021-00719) development application
Mah Architect has applied to the City of Vancouver for permission to install an outdoor seating area, at the above-noted address, consisting of:Approximately 418.0 sq. ft.To be used in conjunction with the proposed Restaurant Class-1 use on the main floorProposed
Q&A
Are the people in the units paying taxes to improve the area ? I believe not which is very concerning Thank you for your comments.
Q&A
It is a huge bottlenck already as the main entry exit point to the West end from North, West corner, not to mention the main entry to downtwon from Lion's Gate Bridge.
Site Analysis Panels
The landowners’ design team has been working with staff over the past few months to build an understanding of the Jericho Lands and its surroundings.