East Fraser Lands Town Square: 3575 Sawmill Cres (Parcel 19.1) and East Fraser Lands Waterfront Precinct: 8711 River District Crossing (Parcel 30), and 3522 E Kent Ave S (Parcels 33/34 and Parcels 35/36) rezoning application

Share East Fraser Lands Town Square: 3575 Sawmill Cres (Parcel 19.1) and East Fraser Lands Waterfront Precinct: 8711 River District Crossing (Parcel 30), and 3522 E Kent Ave S (Parcels 33/34 and Parcels 35/36) rezoning application on Facebook Share East Fraser Lands Town Square: 3575 Sawmill Cres (Parcel 19.1) and East Fraser Lands Waterfront Precinct: 8711 River District Crossing (Parcel 30), and 3522 E Kent Ave S (Parcels 33/34 and Parcels 35/36) rezoning application on Twitter Share East Fraser Lands Town Square: 3575 Sawmill Cres (Parcel 19.1) and East Fraser Lands Waterfront Precinct: 8711 River District Crossing (Parcel 30), and 3522 E Kent Ave S (Parcels 33/34 and Parcels 35/36) rezoning application on Linkedin Email East Fraser Lands Town Square: 3575 Sawmill Cres (Parcel 19.1) and East Fraser Lands Waterfront Precinct: 8711 River District Crossing (Parcel 30), and 3522 E Kent Ave S (Parcels 33/34 and Parcels 35/36) rezoning application link

This application was approved by Council at Public Hearing on February 24, 2026.

The proposal seeks to amend CD-1 (566): East Fraser Lands Town Square District and CD-1 (567): East Fraser Lands Waterfront Precinct of the East Fraser Lands. Consequential amendments to the East Fraser Lands Official Development Plan will be required. The application proposes to:

  • Permit above-grade parking on Parcels 19.1, 33/34 and 35/36;
  • Transfer the affordable/social housing obligation from Parcel 34 to a stand-alone site on Parcel 30;
  • Transfer rental density from Parcel 33/34 to Parcel 19.1;
  • Update the maximum building height:
    • Parcel 19.1, increase from 18 to 26 storeys
    • Parcel 30, decrease from 22 to 6 storeys
    • Parcel 33/34, increase from 23 to 34 storeys
    • Parcel 35/36, increase from 16 to 22 storeys; and
  • Correct the 'live-work' use provisions in CD-1 (567).

No changes to the overall permitted floor area is proposed; however, the density will be redistributed between the sites, with the floor area allocated to below-grade parking being accommodated within the podium levels and additional height proposed for some towers to accommodate the permitted residential floor area. Please see the 'Application documents' for more information.

This application is being considered under the East Fraser Lands Official Development Plan (EFL ODP).

Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

The proposal seeks to amend CD-1 (566): East Fraser Lands Town Square District and CD-1 (567): East Fraser Lands Waterfront Precinct of the East Fraser Lands. Consequential amendments to the East Fraser Lands Official Development Plan will be required. The application proposes to:

  • Permit above-grade parking on Parcels 19.1, 33/34 and 35/36;
  • Transfer the affordable/social housing obligation from Parcel 34 to a stand-alone site on Parcel 30;
  • Transfer rental density from Parcel 33/34 to Parcel 19.1;
  • Update the maximum building height:
    • Parcel 19.1, increase from 18 to 26 storeys
    • Parcel 30, decrease from 22 to 6 storeys
    • Parcel 33/34, increase from 23 to 34 storeys
    • Parcel 35/36, increase from 16 to 22 storeys; and
  • Correct the 'live-work' use provisions in CD-1 (567).

No changes to the overall permitted floor area is proposed; however, the density will be redistributed between the sites, with the floor area allocated to below-grade parking being accommodated within the podium levels and additional height proposed for some towers to accommodate the permitted residential floor area. Please see the 'Application documents' for more information.

This application is being considered under the East Fraser Lands Official Development Plan (EFL ODP).

Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

This application was approved by Council at Public Hearing on February 24, 2026.

The opportunity to ask questions through the Q&A is available from September 10, 2025 to September 23, 2025. 

We post all questions as-is and aim to respond within two business days. Some questions may require coordination with internal departments and additional time may be needed to post a response.

Please note that the comment form will remain open after the Q&A period. The Rezoning Planner can also be contacted directly for any further feedback or questions.

  • Share As I understand it, this rezoning doesn’t add any extra density (nor additional residents) to River District. Could you explain why the building height is being changed and reshuffling the same amount of housing that was already approved? on Facebook Share As I understand it, this rezoning doesn’t add any extra density (nor additional residents) to River District. Could you explain why the building height is being changed and reshuffling the same amount of housing that was already approved? on Twitter Share As I understand it, this rezoning doesn’t add any extra density (nor additional residents) to River District. Could you explain why the building height is being changed and reshuffling the same amount of housing that was already approved? on Linkedin Email As I understand it, this rezoning doesn’t add any extra density (nor additional residents) to River District. Could you explain why the building height is being changed and reshuffling the same amount of housing that was already approved? link

    As I understand it, this rezoning doesn’t add any extra density (nor additional residents) to River District. Could you explain why the building height is being changed and reshuffling the same amount of housing that was already approved?

    Ally MP asked 6 months ago

    Correct--no changes to the overall density is proposed. The density is proposed to be redistributed between the parcels to allow for more efficient floor plates and building design to accommodate above-grade parking. Additional height is proposed for some towers to support a design where the podium contains parking and residential use is shifted to the tower. Previously, the podium contained residential use, with that space dedicated to parking, the tower height is proposed to increase to accommodate the relocated residential space.

  • Share I support the inclusion of a healthcare facility and appreciate that affordable housing and rental housing are still part of the proposal, just redistributed. Could you provide some more context about their relocation? on Facebook Share I support the inclusion of a healthcare facility and appreciate that affordable housing and rental housing are still part of the proposal, just redistributed. Could you provide some more context about their relocation? on Twitter Share I support the inclusion of a healthcare facility and appreciate that affordable housing and rental housing are still part of the proposal, just redistributed. Could you provide some more context about their relocation? on Linkedin Email I support the inclusion of a healthcare facility and appreciate that affordable housing and rental housing are still part of the proposal, just redistributed. Could you provide some more context about their relocation? link

    I support the inclusion of a healthcare facility and appreciate that affordable housing and rental housing are still part of the proposal, just redistributed. Could you provide some more context about their relocation?

    jonk asked 6 months ago

    The space for affordable and rental housing is proposed to be redistributed between Parcel 30 and Parcel 19.1 respectively, to enable more efficient floor plates and building design. The redistribution supports a design in which above-grade parking is concealed within the podium and wrapped by active uses such as shops or homes along the street. This will also result in an increase in tower height while the podium accommodates the parking.

  • Share Where are the plans for the River District community centre and when will the construction start? on Facebook Share Where are the plans for the River District community centre and when will the construction start? on Twitter Share Where are the plans for the River District community centre and when will the construction start? on Linkedin Email Where are the plans for the River District community centre and when will the construction start? link

    Where are the plans for the River District community centre and when will the construction start?

    JordanaW asked 6 months ago

    Thank you for your question. The East Fraser Lands Official Development Plan (ODP) anticipates a community centre and childcare centre to be delivered in Area 1, along with additional park space and other community serving uses throughout the rest of the areas. Timing is dependant on the completion of residential developments to assist with project funding. The developer is to deliver a community centre and co-located childcare in Area 1 and will explore entering into a Park Development Agreement, to the satisfaction of the Park Board, to deliver the community centre plaza at the same time as the community centre. 

  • Share Has there been any assessment regarding how the increased heights might impact birds? There are resident hawks and eagles in the area as well as a significant population of bats. on Facebook Share Has there been any assessment regarding how the increased heights might impact birds? There are resident hawks and eagles in the area as well as a significant population of bats. on Twitter Share Has there been any assessment regarding how the increased heights might impact birds? There are resident hawks and eagles in the area as well as a significant population of bats. on Linkedin Email Has there been any assessment regarding how the increased heights might impact birds? There are resident hawks and eagles in the area as well as a significant population of bats. link

    Has there been any assessment regarding how the increased heights might impact birds? There are resident hawks and eagles in the area as well as a significant population of bats.

    SH asked 6 months ago

    This project will be subject to the Bird Friendly Design Guidelines which include strategies for the design of buildings and landscaped areas on private and public property to reduce conflicts between birds and buildings. Please see the guidelines for more information, along with the additional explanatory information.

  • Share There are increase of 25 storeys in total with a decrease of 16 storeys, please illustrate the meaning of 'no changes to the overall density are proposed'. How does the city forecast the traffic congestion, number of users on the road situation, infrastructure, sewage, social support of the community on this rezoning? on Facebook Share There are increase of 25 storeys in total with a decrease of 16 storeys, please illustrate the meaning of 'no changes to the overall density are proposed'. How does the city forecast the traffic congestion, number of users on the road situation, infrastructure, sewage, social support of the community on this rezoning? on Twitter Share There are increase of 25 storeys in total with a decrease of 16 storeys, please illustrate the meaning of 'no changes to the overall density are proposed'. How does the city forecast the traffic congestion, number of users on the road situation, infrastructure, sewage, social support of the community on this rezoning? on Linkedin Email There are increase of 25 storeys in total with a decrease of 16 storeys, please illustrate the meaning of 'no changes to the overall density are proposed'. How does the city forecast the traffic congestion, number of users on the road situation, infrastructure, sewage, social support of the community on this rezoning? link

    There are increase of 25 storeys in total with a decrease of 16 storeys, please illustrate the meaning of 'no changes to the overall density are proposed'. How does the city forecast the traffic congestion, number of users on the road situation, infrastructure, sewage, social support of the community on this rezoning?

    Ducky asked 7 months ago

    Thank you for your question. The reference to “density,” means the total amount of building space that’s permitted under the current zoning in this area. That overall amount is not proposed to increase, however, the space is being shuffled around between sites so that parking levels above ground can be hidden in the podium level by active uses (like shops or homes) along the street.  This results in an increase in tower height, while the podium is used to contain the parking.

    A Transportation Assessment and Management Study (TAMS) was submitted by the applicant’s Engineers with the rezoning application. The TAMS provides a forecast of the estimated vehicle trips generated by the proposed site. Any off-site improvements, if needed, will be recommended through conditions of approval and reported in the report to Council, following staff analysis of the TAMS.

    The City’s Sewer Design team will forecast the proposed increase in population and sewage discharges based on the proposed building floor area from the rezoning booklet submitted by the applicant. The City’s Engineers will check to see if existing sewer systems downstream have enough capacity to take the proposed site discharges, and if any sewer upgrade would be required as a result of the development.

  • Share Is there a plan to make more parking available, either in the buildings themselves or outside? Short term parking generally doesn't seem to be an issue. But long-term/overnight parking for the residents themselves is disastrous. on Facebook Share Is there a plan to make more parking available, either in the buildings themselves or outside? Short term parking generally doesn't seem to be an issue. But long-term/overnight parking for the residents themselves is disastrous. on Twitter Share Is there a plan to make more parking available, either in the buildings themselves or outside? Short term parking generally doesn't seem to be an issue. But long-term/overnight parking for the residents themselves is disastrous. on Linkedin Email Is there a plan to make more parking available, either in the buildings themselves or outside? Short term parking generally doesn't seem to be an issue. But long-term/overnight parking for the residents themselves is disastrous. link

    Is there a plan to make more parking available, either in the buildings themselves or outside? Short term parking generally doesn't seem to be an issue. But long-term/overnight parking for the residents themselves is disastrous.

    Kris B asked 7 months ago

    The proposed development is required to comply with the Parking By-law with respect to off-street vehicle parking spaces and required to provide a Transportation Demand Management plan that will help to reduce development demand for vehicle trips and parking. Curbside regulations will be reviewed and updates implemented in advance of building occupancy to ensure appropriate availability of curbside parking.

  • Share New units need to be larger to realistically house a small family. Is the intention of any of these new developments to include larger size apartments, with adequate storage and living space? Current units in this area have no room for family expansion or for storage space within the units themselves (basement storage shouldn't count towards storage as it is separate from the unit and not adequately secure). "Dens" are simply pantries for the kitchen and most bedrooms have barely any room for storage. on Facebook Share New units need to be larger to realistically house a small family. Is the intention of any of these new developments to include larger size apartments, with adequate storage and living space? Current units in this area have no room for family expansion or for storage space within the units themselves (basement storage shouldn't count towards storage as it is separate from the unit and not adequately secure). "Dens" are simply pantries for the kitchen and most bedrooms have barely any room for storage. on Twitter Share New units need to be larger to realistically house a small family. Is the intention of any of these new developments to include larger size apartments, with adequate storage and living space? Current units in this area have no room for family expansion or for storage space within the units themselves (basement storage shouldn't count towards storage as it is separate from the unit and not adequately secure). "Dens" are simply pantries for the kitchen and most bedrooms have barely any room for storage. on Linkedin Email New units need to be larger to realistically house a small family. Is the intention of any of these new developments to include larger size apartments, with adequate storage and living space? Current units in this area have no room for family expansion or for storage space within the units themselves (basement storage shouldn't count towards storage as it is separate from the unit and not adequately secure). "Dens" are simply pantries for the kitchen and most bedrooms have barely any room for storage. link

    New units need to be larger to realistically house a small family. Is the intention of any of these new developments to include larger size apartments, with adequate storage and living space? Current units in this area have no room for family expansion or for storage space within the units themselves (basement storage shouldn't count towards storage as it is separate from the unit and not adequately secure). "Dens" are simply pantries for the kitchen and most bedrooms have barely any room for storage.

    Kris B asked 7 months ago

    Thank you for your question. The EFL ODP requires that 35% of units within each building must be suitable for families with children, and that 10% of the units must have at least 3 bedrooms. Units are to be designed in accordance with the High Density Housing for Families with Children Guidelines, including provision of bulk storage which may be either within the unit or in an easily accessible, secure area of the building - which could include secure storage in the underground parking area.

    Overall, Staff are undertaking a review of design requirements for new multi-family housing including looking at trends in the size of units proposed, and considering opportunities to address unit livability through the upcoming Citywide Development Guidelines while balancing development viability.

  • Share Please advise what infrastructure is being considered to support this population growth in this community and when it will be built ? Even with the existing population of 6000 people, the housing outpaced underwhelming community infrastructure. We only have 2 tennis courts and 1 basketball hoop for the entire 6000. on Facebook Share Please advise what infrastructure is being considered to support this population growth in this community and when it will be built ? Even with the existing population of 6000 people, the housing outpaced underwhelming community infrastructure. We only have 2 tennis courts and 1 basketball hoop for the entire 6000. on Twitter Share Please advise what infrastructure is being considered to support this population growth in this community and when it will be built ? Even with the existing population of 6000 people, the housing outpaced underwhelming community infrastructure. We only have 2 tennis courts and 1 basketball hoop for the entire 6000. on Linkedin Email Please advise what infrastructure is being considered to support this population growth in this community and when it will be built ? Even with the existing population of 6000 people, the housing outpaced underwhelming community infrastructure. We only have 2 tennis courts and 1 basketball hoop for the entire 6000. link

    Please advise what infrastructure is being considered to support this population growth in this community and when it will be built ? Even with the existing population of 6000 people, the housing outpaced underwhelming community infrastructure. We only have 2 tennis courts and 1 basketball hoop for the entire 6000.

    Anna Bukreeva asked 7 months ago

    The East Fraser Lands Official Development Plan (ODP) anticipates a community centre and childcare centre to be delivered in Area 1, along with additional park space and other community serving uses throughout the rest of the areas. Timing is dependant on the completion of residential developments to assist with project funding. The developer is to deliver a community centre and co-located childcare in Area 1 and will explore entering into a Park Development Agreement, to the satisfaction of the Park Board, to deliver the community centre plaza at the same time as the community centre. While not related to the subject Area 1 text amendment, the ODP includes two ecological corridors, the Kinross corridor and the Avalon corridor which includes playing fields. The ODP also identifies a new elementary school and land has been set aside for it’s future use. The timing of construction is dependent on Vancouver School Board (VSB) funding.  


  • Share Please advise what transportation is being considered for this community? The community of 6000 people is currently served by two buses . No 31 that is ultra small bus and always full; number 80 that is only functioning during rush hours on the weekdays. What options are you considering to add to connect this community and support such population growth? Light rail? metro? on Facebook Share Please advise what transportation is being considered for this community? The community of 6000 people is currently served by two buses . No 31 that is ultra small bus and always full; number 80 that is only functioning during rush hours on the weekdays. What options are you considering to add to connect this community and support such population growth? Light rail? metro? on Twitter Share Please advise what transportation is being considered for this community? The community of 6000 people is currently served by two buses . No 31 that is ultra small bus and always full; number 80 that is only functioning during rush hours on the weekdays. What options are you considering to add to connect this community and support such population growth? Light rail? metro? on Linkedin Email Please advise what transportation is being considered for this community? The community of 6000 people is currently served by two buses . No 31 that is ultra small bus and always full; number 80 that is only functioning during rush hours on the weekdays. What options are you considering to add to connect this community and support such population growth? Light rail? metro? link

    Please advise what transportation is being considered for this community? The community of 6000 people is currently served by two buses . No 31 that is ultra small bus and always full; number 80 that is only functioning during rush hours on the weekdays. What options are you considering to add to connect this community and support such population growth? Light rail? metro?

    Anna Bukreeva asked 7 months ago

    TransLink the region's primary operator of transit services.  While the City does not have the authority to implement additional capacity, new routes, or stations, the City works with TransLink to support infrastructure requirements and amenities for transit (stops, shelters, etc.), advocate for increasing services, and work to improve transit priority. 

    As you’ve mentioned, Routes 80 and 31 are transit connections at the River District. TransLink have increased service on Route 31, shortening wait times throughout the week. The City has not heard of any planned service changes to Route 80 or plans to add new routes to the River District Area other than a possible future bus loops around Sawmill Crescent and E Kent Ave.

    TransLink is currently undertaking Transport 2050 to identify the long-range for transportation in the region, which is likely to include considerable increases in transit priority and higher-order transit While the City continues to prioritize and work with TransLink to improve transit, implementation and timing of improvements is subject to direction and funding from TransLink.

  • Share When will construction begin on parcels 30, 33/34 and 35/36? on Facebook Share When will construction begin on parcels 30, 33/34 and 35/36? on Twitter Share When will construction begin on parcels 30, 33/34 and 35/36? on Linkedin Email When will construction begin on parcels 30, 33/34 and 35/36? link

    When will construction begin on parcels 30, 33/34 and 35/36?

    CharVan asked 7 months ago

    Construction is anticipated to begin in 2028 but is dependent on developer initiated timelines and approval processes.