540 W 65th Ave and 8120-8168 Lord St rezoning application

Share 540 W 65th Ave and 8120-8168 Lord St rezoning application on Facebook Share 540 W 65th Ave and 8120-8168 Lord St rezoning application on Twitter Share 540 W 65th Ave and 8120-8168 Lord St rezoning application on Linkedin Email 540 W 65th Ave and 8120-8168 Lord St rezoning application link

This application was approved by Council at Public Hearing on December 12, 2023


We would like your feedback on a rezoning application at 540 W 65th Ave and 8120-8168 Lord St. The proposal is to allow for the development of two six-storey residential buildings over two levels of underground parking. The zoning would change from R1-1 (Residential Inclusive) District to CD-1 (Comprehensive Development) District. This proposal includes:

  • 146 secured market rental units (including 5 below market rental units);
  • A floor space ratio (FSR) of 2.88;
  • A floor area of 8,859 sq. m (95,360 sq. ft.);
  • A building height of 20 m (65.5 ft.); and
  • 75 vehicle parking spaces and 277 bicycle parking spaces.

The application is being considered under the Cambie Corridor Plan.

Application drawings and statistics on this webpage are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.



We would like your feedback on a rezoning application at 540 W 65th Ave and 8120-8168 Lord St. The proposal is to allow for the development of two six-storey residential buildings over two levels of underground parking. The zoning would change from R1-1 (Residential Inclusive) District to CD-1 (Comprehensive Development) District. This proposal includes:

  • 146 secured market rental units (including 5 below market rental units);
  • A floor space ratio (FSR) of 2.88;
  • A floor area of 8,859 sq. m (95,360 sq. ft.);
  • A building height of 20 m (65.5 ft.); and
  • 75 vehicle parking spaces and 277 bicycle parking spaces.

The application is being considered under the Cambie Corridor Plan.

Application drawings and statistics on this webpage are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.


This application was approved by Council at Public Hearing on December 12, 2023

The opportunity to ask questions through the Q&A is available February 20, 2023 to March 12, 2023.

We post all questions as-is and aim to respond within two business days. Some questions may require coordination with internal departments and additional time may be needed to post a response.

Please note that the comment form will remain open after the virtual open house time period. The Rezoning Planner can also be contacted directly for any further feedback or questions.

  • Share Who is the developer for this project? How is the building going to affect traffic in this area? Where will be the CAC’s be spent in the area? on Facebook Share Who is the developer for this project? How is the building going to affect traffic in this area? Where will be the CAC’s be spent in the area? on Twitter Share Who is the developer for this project? How is the building going to affect traffic in this area? Where will be the CAC’s be spent in the area? on Linkedin Email Who is the developer for this project? How is the building going to affect traffic in this area? Where will be the CAC’s be spent in the area? link

    Who is the developer for this project? How is the building going to affect traffic in this area? Where will be the CAC’s be spent in the area?

    Tracy B asked about 1 year ago

    Q: Who is the developer for this project?

    A: As per the Applicant project team listed on the page 29 of 540 W 65th Ave and 8120-8168 Lord St - Applicant Boards (vancouver.ca), the Client/Development Manager is Landmark Premiere Properties Ltd.

    Q: How is the building going to affect traffic in this area?

    A: The rezoning application proposes a modest sized rental project in an area well served by transit. This project will be required to meet the Parking By-law. However, the Applicant has submitted a transportation demand management plan, and through transportation demand management strategies, this project may be eligible for parking reductions. The Applicant has also submitted a transportation assessment and management study by Bunt and Associates dated July 29, 2022. The study states,  “the proposed form of development is expected to generate approximately 37 vehicle trips during both the weekday AM and weekday PM peak hours. Even without considering the trip generation of the existing site, the proposed development vehicle trip generation is well below the generally accepted threshold of 100 or more added (new) peak direction trips.” 

    Q: Where will be the CAC’s be spent in the area?

    A: As part of reviewing the rezoning application, staff will review the financial performance of the application to determine if a community amenity contribution (CAC) is generated. A CAC may result in a cash contribution which may be directed to the Marpole Plan Public Benefits Strategy or could result in improved affordability in the project. However at this point, staff are still reviewing the application materials and no conclusions have been made yet.