6333-6369 Yukon St rezoning application

Share 6333-6369 Yukon St rezoning application on Facebook Share 6333-6369 Yukon St rezoning application on Twitter Share 6333-6369 Yukon St rezoning application on Linkedin Email 6333-6369 Yukon St rezoning application link

The City of Vancouver has received an application to rezone the subject site from R1-1 (Residential Inclusive) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 23-storey rental building with a 6-storey podium and includes:

  • 276 units with 20% of the floor area for below-market units;
  • A floor space ratio (FSR) of 6.5; and
  • A building height of 82.3 m (270 ft.) with additional height for rooftop amenity space.

This application is being considered under the Transit-Oriented Areas Rezoning Policy

Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

The City of Vancouver has received an application to rezone the subject site from R1-1 (Residential Inclusive) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 23-storey rental building with a 6-storey podium and includes:

  • 276 units with 20% of the floor area for below-market units;
  • A floor space ratio (FSR) of 6.5; and
  • A building height of 82.3 m (270 ft.) with additional height for rooftop amenity space.

This application is being considered under the Transit-Oriented Areas Rezoning Policy

Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

​The Q&A period has concluded. Thank you for participating.

The opportunity to ask questions through the Q&A is available from September 10 to September 23, 2025. 

We post all questions as-is and aim to respond within two business days. Some questions may require coordination with internal departments and additional time may be needed to post a response.

Please note that the comment form will remain open after the Q&A period. The Rezoning Planner can also be contacted directly for any further feedback or questions.

Page last updated: 24 Sep 2025, 08:51 AM