Share 8530-8550 Cambie St rezoning application on FacebookShare 8530-8550 Cambie St rezoning application on TwitterShare 8530-8550 Cambie St rezoning application on LinkedinEmail 8530-8550 Cambie St rezoning application link
The City of Vancouver has received an application to rezone the subject site from I-2 (Industrial) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of two 43-storey towers, one 10-storey tower, and one seven-storey tower over a shared three-storey podium and includes:
1,000 rental units, with 20% of the floor area for below-market units;
Industrial space on the first and second level;
Commercial space and a rooftop park on level three;
A private childcare facility;
A private senior’s centre;
A floor space ratio (FSR) of 5.33; and
A range in building heights from 44.1 m (144.7 ft.) to 137.7 m (451 ft.).
This application is being considered under theMetro 2050clause to consider residential uses in Employment Lands within 200 metres of a rapid transit station and within a Frequent Transit Development Area.
Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.
The City of Vancouver has received an application to rezone the subject site from I-2 (Industrial) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of two 43-storey towers, one 10-storey tower, and one seven-storey tower over a shared three-storey podium and includes:
1,000 rental units, with 20% of the floor area for below-market units;
Industrial space on the first and second level;
Commercial space and a rooftop park on level three;
A private childcare facility;
A private senior’s centre;
A floor space ratio (FSR) of 5.33; and
A range in building heights from 44.1 m (144.7 ft.) to 137.7 m (451 ft.).
This application is being considered under theMetro 2050clause to consider residential uses in Employment Lands within 200 metres of a rapid transit station and within a Frequent Transit Development Area.
Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.