888 W Broadway text amendment

Share 888 W Broadway text amendment on Facebook Share 888 W Broadway text amendment on Twitter Share 888 W Broadway text amendment on Linkedin Email 888 W Broadway text amendment link

This application was approved by Council at Public Hearing on February 26, 2026.

The City of Vancouver has received an application to amend the CD-1 (843) (Comprehensive Development) District to permit a change of use for the development of two buildings (15 and 11 storeys) connected by a two-storey podium. The proposal includes:

  • Changing the proposed use of the 11-storey (west) tower from hotel to residential to permit 105 secured rental units, including 20% of units (approximately 21) at below-market rates for a minimum of 10 years
  • Keeping the 15-storey (east) tower as hotel use with 279 hotel rooms

The overall maximum height of 51 m (167 ft), FSR of 8.96, and commercial space on the ground floor permitted in CD-1 (843) are not proposed to be changed.

This application is being considered under the Broadway Plan.

Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

The City of Vancouver has received an application to amend the CD-1 (843) (Comprehensive Development) District to permit a change of use for the development of two buildings (15 and 11 storeys) connected by a two-storey podium. The proposal includes:

  • Changing the proposed use of the 11-storey (west) tower from hotel to residential to permit 105 secured rental units, including 20% of units (approximately 21) at below-market rates for a minimum of 10 years
  • Keeping the 15-storey (east) tower as hotel use with 279 hotel rooms

The overall maximum height of 51 m (167 ft), FSR of 8.96, and commercial space on the ground floor permitted in CD-1 (843) are not proposed to be changed.

This application is being considered under the Broadway Plan.

Application drawings and statistics are posted as-submitted to the City. Following staff review, the final project statistics are documented within the referral report.

This application was approved by Council at Public Hearing on February 26, 2026.

The opportunity to ask questions through the Q&A is available from November 19 to December 2, 2025. 

We post all questions as-is and aim to respond within two business days. Some questions may require coordination with internal departments and additional time may be needed to post a response.

Please note that the comment form will remain open after the Q&A period. The Rezoning Planner can also be contacted directly for any further feedback or questions.