Share 966 W 18th Ave (Balfour Block) rezoning application (906-982 W 18th Ave, 907-975 W 19th Ave & 3403-3415 Laurel St) on Facebook Share 966 W 18th Ave (Balfour Block) rezoning application (906-982 W 18th Ave, 907-975 W 19th Ave & 3403-3415 Laurel St) on Twitter Share 966 W 18th Ave (Balfour Block) rezoning application (906-982 W 18th Ave, 907-975 W 19th Ave & 3403-3415 Laurel St) on Linkedin Email 966 W 18th Ave (Balfour Block) rezoning application (906-982 W 18th Ave, 907-975 W 19th Ave & 3403-3415 Laurel St) link


RR-2C Building Example

R1-1 Building Example

The City of Vancouver has received a new application to rezone the subject site from CD-1 (884) District to RR-2C (Residential Rental) and R1-1 (Residential) Districts. The application is inconsistent with the Cambie Corridor Plan, as it does not deliver the public open space and childcare objectives set out in the enabling policy.

The northwest portion of the site is proposed to be rezoned to:

  • RR-2C to allow for:
    • A 6-storey residential rental building; with
    • A maximum building height of 19.8 m; and
    • A maximum floor space ratio (FSR) of 2.70.
    • Approximately 90 units, with no below-market rental units proposed.

The remaining portion of the site is proposed to be subdivided into twenty lots and be rezoned to:

  • R1-1 to allow for:
    • Multiplex housing (or other smaller typologies allowable under this zoning); with
    • A maximum height of 11.5 m; and
    • A maximum density of 1.00 FSR; and
    • Up to 4 dwelling units per lot.

If approved, this site's zoning will change to RR-2C and R1-1. Any development on the site would have to conform to these zoning regulations and design guidelines. This approach differs from a site-specific Comprehensive Development (CD) District rezoning, as it allows for zoning certainty and consistency through established district schedules rather than project-specific regulations.

The City’s Tenant Relocation and Protection Policy applies to this site. This policy provides assistance and protection to eligible renters impacted by redevelopment activity. To learn more visit: vancouver.ca/protecting-tenants.

The specific form of development (building design) will be reviewed through a future Development Permit process. Application drawings will be available for viewing and comment at that time.


Previous rezoning application (August 30, 2021):

The proposal allowed for the development of a 6-storey rental building; a 6-storey condo building with a rooftop amenity and a childcare space on the ground floor; seven 3- to 4-storey townhome buildings. The proposal included public open space. This By-Law has been enacted on December 10, 2024.

For further detail refer to: https://www.shapeyourcity.ca/balfour-block.

Note: Additional information has been added on January 30, 2026.


RR-2C Building Example

R1-1 Building Example

The City of Vancouver has received a new application to rezone the subject site from CD-1 (884) District to RR-2C (Residential Rental) and R1-1 (Residential) Districts. The application is inconsistent with the Cambie Corridor Plan, as it does not deliver the public open space and childcare objectives set out in the enabling policy.

The northwest portion of the site is proposed to be rezoned to:

  • RR-2C to allow for:
    • A 6-storey residential rental building; with
    • A maximum building height of 19.8 m; and
    • A maximum floor space ratio (FSR) of 2.70.
    • Approximately 90 units, with no below-market rental units proposed.

The remaining portion of the site is proposed to be subdivided into twenty lots and be rezoned to:

  • R1-1 to allow for:
    • Multiplex housing (or other smaller typologies allowable under this zoning); with
    • A maximum height of 11.5 m; and
    • A maximum density of 1.00 FSR; and
    • Up to 4 dwelling units per lot.

If approved, this site's zoning will change to RR-2C and R1-1. Any development on the site would have to conform to these zoning regulations and design guidelines. This approach differs from a site-specific Comprehensive Development (CD) District rezoning, as it allows for zoning certainty and consistency through established district schedules rather than project-specific regulations.

The City’s Tenant Relocation and Protection Policy applies to this site. This policy provides assistance and protection to eligible renters impacted by redevelopment activity. To learn more visit: vancouver.ca/protecting-tenants.

The specific form of development (building design) will be reviewed through a future Development Permit process. Application drawings will be available for viewing and comment at that time.


Previous rezoning application (August 30, 2021):

The proposal allowed for the development of a 6-storey rental building; a 6-storey condo building with a rooftop amenity and a childcare space on the ground floor; seven 3- to 4-storey townhome buildings. The proposal included public open space. This By-Law has been enacted on December 10, 2024.

For further detail refer to: https://www.shapeyourcity.ca/balfour-block.

Note: Additional information has been added on January 30, 2026.

The Q&A period has concluded. Thank you for participating.

The opportunity to ask questions through the Q&A is available from February 25 to March 10, 2026. 

We post all questions as-is and aim to respond within two business days. Some questions may require coordination with internal departments and additional time may be needed to post a response.

Please note that the comment form will remain open after the Q&A period. The Rezoning Planner can also be contacted directly for any further feedback or questions.

  • Share Can you please confirm if once sub-divided Wesgroup could sell all or some of the 20 lots to various developers, leading to a chaotic scenario for the neighbourhood with 20 adjacent lots being developed in an orchestrated way. While I have read that it is your current intention to develop all 21 lots, my question is not what is your current intention, it is what will this rezoning allow you to do in the future should your intention change. on Facebook Share Can you please confirm if once sub-divided Wesgroup could sell all or some of the 20 lots to various developers, leading to a chaotic scenario for the neighbourhood with 20 adjacent lots being developed in an orchestrated way. While I have read that it is your current intention to develop all 21 lots, my question is not what is your current intention, it is what will this rezoning allow you to do in the future should your intention change. on Twitter Share Can you please confirm if once sub-divided Wesgroup could sell all or some of the 20 lots to various developers, leading to a chaotic scenario for the neighbourhood with 20 adjacent lots being developed in an orchestrated way. While I have read that it is your current intention to develop all 21 lots, my question is not what is your current intention, it is what will this rezoning allow you to do in the future should your intention change. on Linkedin Email Can you please confirm if once sub-divided Wesgroup could sell all or some of the 20 lots to various developers, leading to a chaotic scenario for the neighbourhood with 20 adjacent lots being developed in an orchestrated way. While I have read that it is your current intention to develop all 21 lots, my question is not what is your current intention, it is what will this rezoning allow you to do in the future should your intention change. link

    Can you please confirm if once sub-divided Wesgroup could sell all or some of the 20 lots to various developers, leading to a chaotic scenario for the neighbourhood with 20 adjacent lots being developed in an orchestrated way. While I have read that it is your current intention to develop all 21 lots, my question is not what is your current intention, it is what will this rezoning allow you to do in the future should your intention change.

    Melissa McKinnon asked 27 days ago

    The City’s authority in this process is limited to regulating land use through district zoning. Once a property is rezoned, the owner retains the ability to either develop the site themselves or sell some or all of the subdivided lots to third parties, who may then proceed with development in accordance with the approved zoning.

    With respect to construction-related impacts, all builders operating in the City of Vancouver—regardless of who owns or develops the lots—must comply with the City’s regulations and requirements, including but not limited to:

    These requirements apply consistently to ensure construction activities are managed in an orderly and predictable way across the city.

     

  • Share Can you please justify the removal of the green space at the corner of 19th and Laurel St.? on Facebook Share Can you please justify the removal of the green space at the corner of 19th and Laurel St.? on Twitter Share Can you please justify the removal of the green space at the corner of 19th and Laurel St.? on Linkedin Email Can you please justify the removal of the green space at the corner of 19th and Laurel St.? link

    Can you please justify the removal of the green space at the corner of 19th and Laurel St.?

    Melissa McKinnon asked 27 days ago

    The applicant provided the following: 

    The corner park was an in-kind public benefit contemplated to be delivered with the previous CD-1 development concept. As with all in-kind public benefits, these public benefits are ultimately contingent on the viability of the proposal. Due to the deterioration of the project’s overall viability, the ability to deliver this public benefit also became unviable, despite the desire to advance the proposal as originally envisioned.

  • Share It has been stated that the applicant proposes to continue to meet the TRPP and the additional tenant protections applicable in the Cambie Corridor Plan. As with the BMR requirement, can the applicant receive relaxed requirements/standards on their TRPP commitment? on Facebook Share It has been stated that the applicant proposes to continue to meet the TRPP and the additional tenant protections applicable in the Cambie Corridor Plan. As with the BMR requirement, can the applicant receive relaxed requirements/standards on their TRPP commitment? on Twitter Share It has been stated that the applicant proposes to continue to meet the TRPP and the additional tenant protections applicable in the Cambie Corridor Plan. As with the BMR requirement, can the applicant receive relaxed requirements/standards on their TRPP commitment? on Linkedin Email It has been stated that the applicant proposes to continue to meet the TRPP and the additional tenant protections applicable in the Cambie Corridor Plan. As with the BMR requirement, can the applicant receive relaxed requirements/standards on their TRPP commitment? link

    It has been stated that the applicant proposes to continue to meet the TRPP and the additional tenant protections applicable in the Cambie Corridor Plan. As with the BMR requirement, can the applicant receive relaxed requirements/standards on their TRPP commitment?

    neighbourNic asked 27 days ago

    The applicant is required to continue fulfilling the Tenant Relocation Plan (TRP) commitments secured through the 2021 rezoning for this site. This means that all tenants who were confirmed as eligible at that time will retain the right to return to a unit in the new building at their current rent once it is completed. This right to return applies even if the new building does not include designated below‑market rental units. Eligible tenants will be offered housing at their current rents (plus annual allowable adjustments in accordance with the Residential Tenancy Act) for as long as they maintain their tenancy; however, no below‑market rental units would be available for new tenants moving into the building.

  • Share Why has the applicant requested to relax the requirement 20% BMR requirement? Can you please provide examples of other applications that have been approved with these relaxed requirements? on Facebook Share Why has the applicant requested to relax the requirement 20% BMR requirement? Can you please provide examples of other applications that have been approved with these relaxed requirements? on Twitter Share Why has the applicant requested to relax the requirement 20% BMR requirement? Can you please provide examples of other applications that have been approved with these relaxed requirements? on Linkedin Email Why has the applicant requested to relax the requirement 20% BMR requirement? Can you please provide examples of other applications that have been approved with these relaxed requirements? link

    Why has the applicant requested to relax the requirement 20% BMR requirement? Can you please provide examples of other applications that have been approved with these relaxed requirements?

    neighbourNic asked 27 days ago

    The applicant has submitted a revised proposal for the Balfour Block site which includes a six-storey rental building and multiplex zoning for the remainder of the site. This represents a shift from the previously approved development in terms of the scale, mix of uses, and overall floor area. The applicant is proposing the 6-storey rental building under the RR-2C district schedule, but with the removal of the below-market rental component. While the proposal is currently under review, the applicant indicates that this aligns with the City’s forthcoming work related to supporting development viability of low-rise developments in challenging market conditions, to ensure the continued delivery of much‑needed housing. Refer to Section 1A of the Report Back on Supporting Development Viability and Unlocking New Housing Supply presented to Council on December 10, 2025. As part of this work, staff are proposing changes to the RR (Residential Rental) district schedules including the removal of the below-market rental requirement for six-storey rental buildings under RR-2C zoning, which will be considered by Council later this year.

  • Share How will this project address the parking and traffic needs of the neighbourhood? The current answers given do not actually confirm any actionable plans, nor if there are plans to even provide parking, just that they are required to comply. This project has already removed neighbour amenities, so it does not seem like compliance requirements are very strict. on Facebook Share How will this project address the parking and traffic needs of the neighbourhood? The current answers given do not actually confirm any actionable plans, nor if there are plans to even provide parking, just that they are required to comply. This project has already removed neighbour amenities, so it does not seem like compliance requirements are very strict. on Twitter Share How will this project address the parking and traffic needs of the neighbourhood? The current answers given do not actually confirm any actionable plans, nor if there are plans to even provide parking, just that they are required to comply. This project has already removed neighbour amenities, so it does not seem like compliance requirements are very strict. on Linkedin Email How will this project address the parking and traffic needs of the neighbourhood? The current answers given do not actually confirm any actionable plans, nor if there are plans to even provide parking, just that they are required to comply. This project has already removed neighbour amenities, so it does not seem like compliance requirements are very strict. link

    How will this project address the parking and traffic needs of the neighbourhood? The current answers given do not actually confirm any actionable plans, nor if there are plans to even provide parking, just that they are required to comply. This project has already removed neighbour amenities, so it does not seem like compliance requirements are very strict.

    neighbourNic asked 27 days ago

    The City posts rezoning applications in the form they are received. As part of the consultation process, we encourage the public to provide feedback so staff can consider it during the review. At this stage, Engineering Services has not yet completed its review of the application. However, as with all development projects in Vancouver, the proposal will be required to comply with the Parking By-law, which mandates parking provisions appropriate to the scale and use of the building. Because the applicant is seeking a standard district rezoning and has not submitted a detailed form of development, there are currently no finalized plans regarding parking or traffic management. Based on the information available, staff’s best assessment is that the project will need to meet all applicable by-laws once detailed designs are submitted and reviewed.

  • Share What does the right to return look like for the tenants that fall under the Tenant Relocation Program when there is no longer below-market housing being offered? on Facebook Share What does the right to return look like for the tenants that fall under the Tenant Relocation Program when there is no longer below-market housing being offered? on Twitter Share What does the right to return look like for the tenants that fall under the Tenant Relocation Program when there is no longer below-market housing being offered? on Linkedin Email What does the right to return look like for the tenants that fall under the Tenant Relocation Program when there is no longer below-market housing being offered? link

    What does the right to return look like for the tenants that fall under the Tenant Relocation Program when there is no longer below-market housing being offered?

    neighbourNic asked 27 days ago

    Thank you for your question. Eligible tenants will still have the right to return to a unit in the new building at their current rent once it is built. This applies even if the new building does not include designated below‑market rental units.

  • Share Can you please share the current project timeline? Should rezoning be approved, when do you plan to obtain the DP, BP, start construction and complete construction of the 21 properties? Thanks on Facebook Share Can you please share the current project timeline? Should rezoning be approved, when do you plan to obtain the DP, BP, start construction and complete construction of the 21 properties? Thanks on Twitter Share Can you please share the current project timeline? Should rezoning be approved, when do you plan to obtain the DP, BP, start construction and complete construction of the 21 properties? Thanks on Linkedin Email Can you please share the current project timeline? Should rezoning be approved, when do you plan to obtain the DP, BP, start construction and complete construction of the 21 properties? Thanks link

    Can you please share the current project timeline? Should rezoning be approved, when do you plan to obtain the DP, BP, start construction and complete construction of the 21 properties? Thanks

    Melissa McKinnon asked 27 days ago

    The applicant has stated that they will progress the project in accordance with the City of Vancouver’s permitting process. If the rezoning is approved, the permitting process typically takes 18-24 months from this stage until construction can start.

  • Share Given the increase of vehicles driving at speed down West 19th coming from Oak Street/Douglas Crescent plus the increase in volume with this new development, is the City considering a pocket park/bike traffic only eg. Yukon & 17th at the intersection of West 19th & Laurel or, at minimum, creating a slow street or a traffic calming circle. This is well used intersection for school children and families. on Facebook Share Given the increase of vehicles driving at speed down West 19th coming from Oak Street/Douglas Crescent plus the increase in volume with this new development, is the City considering a pocket park/bike traffic only eg. Yukon & 17th at the intersection of West 19th & Laurel or, at minimum, creating a slow street or a traffic calming circle. This is well used intersection for school children and families. on Twitter Share Given the increase of vehicles driving at speed down West 19th coming from Oak Street/Douglas Crescent plus the increase in volume with this new development, is the City considering a pocket park/bike traffic only eg. Yukon & 17th at the intersection of West 19th & Laurel or, at minimum, creating a slow street or a traffic calming circle. This is well used intersection for school children and families. on Linkedin Email Given the increase of vehicles driving at speed down West 19th coming from Oak Street/Douglas Crescent plus the increase in volume with this new development, is the City considering a pocket park/bike traffic only eg. Yukon & 17th at the intersection of West 19th & Laurel or, at minimum, creating a slow street or a traffic calming circle. This is well used intersection for school children and families. link

    Given the increase of vehicles driving at speed down West 19th coming from Oak Street/Douglas Crescent plus the increase in volume with this new development, is the City considering a pocket park/bike traffic only eg. Yukon & 17th at the intersection of West 19th & Laurel or, at minimum, creating a slow street or a traffic calming circle. This is well used intersection for school children and families.

    Phillipa asked 28 days ago

    The proposed development is required to comply with the updated Parking By-law with respect to off-street vehicle parking spaces  (with reduced parking minimums) and well-sited to encourage reduced vehicle trip and parking demand. It is in close proximity to the frequent transit network (Oak St) and cycling infrastructure (existing bikeway along Heather St). As part of the rezoning process, Engineering staff includes a review of the application with respect to transportation impacts and, if identified, may include development conditions for off-site requirements to improve transportation operations and safety for pedestrians, cyclists, and motorists adjacent to the site.

  • Share Would you please confirm that the current proposal will see 170 new residential units spread over one 6 story tower as well as 20 33 foot lots with 4 residential units per lot. If this is the case, please state what traffic calming measures will be implemented to address the inevitable increased volume of traffic on 18th and 19th Ave, affecting existing residents. The city has now blocked off 18th Avenue at Cambie street for a public plaza which has already has pushed more traffic onto 19th Ave. between Oak and Cambie. Nineteenth Ave. has become an extremely busy traffic thoroughfare through the residential neighbourhood of Douglas Park. Vehicles speed past a new dog park, existing tennis courts, a children’s playground, children walking to and from Edith Clavell School, people walking to Douglas Park Recreational Centre as well as a well used bike route. Nineteenth Ave. has parking on both sides of the street, is extremely narrow particularly between Heather and Ash streets making it severely congested and difficult to see at intersections. These are all issues with the current traffic load let alone an increase of at least 170 more vehicles daily from the new development. How will this be addressed to maintain livability and safety? Thank you for the opportunity to ask this question and for your response in advance. on Facebook Share Would you please confirm that the current proposal will see 170 new residential units spread over one 6 story tower as well as 20 33 foot lots with 4 residential units per lot. If this is the case, please state what traffic calming measures will be implemented to address the inevitable increased volume of traffic on 18th and 19th Ave, affecting existing residents. The city has now blocked off 18th Avenue at Cambie street for a public plaza which has already has pushed more traffic onto 19th Ave. between Oak and Cambie. Nineteenth Ave. has become an extremely busy traffic thoroughfare through the residential neighbourhood of Douglas Park. Vehicles speed past a new dog park, existing tennis courts, a children’s playground, children walking to and from Edith Clavell School, people walking to Douglas Park Recreational Centre as well as a well used bike route. Nineteenth Ave. has parking on both sides of the street, is extremely narrow particularly between Heather and Ash streets making it severely congested and difficult to see at intersections. These are all issues with the current traffic load let alone an increase of at least 170 more vehicles daily from the new development. How will this be addressed to maintain livability and safety? Thank you for the opportunity to ask this question and for your response in advance. on Twitter Share Would you please confirm that the current proposal will see 170 new residential units spread over one 6 story tower as well as 20 33 foot lots with 4 residential units per lot. If this is the case, please state what traffic calming measures will be implemented to address the inevitable increased volume of traffic on 18th and 19th Ave, affecting existing residents. The city has now blocked off 18th Avenue at Cambie street for a public plaza which has already has pushed more traffic onto 19th Ave. between Oak and Cambie. Nineteenth Ave. has become an extremely busy traffic thoroughfare through the residential neighbourhood of Douglas Park. Vehicles speed past a new dog park, existing tennis courts, a children’s playground, children walking to and from Edith Clavell School, people walking to Douglas Park Recreational Centre as well as a well used bike route. Nineteenth Ave. has parking on both sides of the street, is extremely narrow particularly between Heather and Ash streets making it severely congested and difficult to see at intersections. These are all issues with the current traffic load let alone an increase of at least 170 more vehicles daily from the new development. How will this be addressed to maintain livability and safety? Thank you for the opportunity to ask this question and for your response in advance. on Linkedin Email Would you please confirm that the current proposal will see 170 new residential units spread over one 6 story tower as well as 20 33 foot lots with 4 residential units per lot. If this is the case, please state what traffic calming measures will be implemented to address the inevitable increased volume of traffic on 18th and 19th Ave, affecting existing residents. The city has now blocked off 18th Avenue at Cambie street for a public plaza which has already has pushed more traffic onto 19th Ave. between Oak and Cambie. Nineteenth Ave. has become an extremely busy traffic thoroughfare through the residential neighbourhood of Douglas Park. Vehicles speed past a new dog park, existing tennis courts, a children’s playground, children walking to and from Edith Clavell School, people walking to Douglas Park Recreational Centre as well as a well used bike route. Nineteenth Ave. has parking on both sides of the street, is extremely narrow particularly between Heather and Ash streets making it severely congested and difficult to see at intersections. These are all issues with the current traffic load let alone an increase of at least 170 more vehicles daily from the new development. How will this be addressed to maintain livability and safety? Thank you for the opportunity to ask this question and for your response in advance. link

    Would you please confirm that the current proposal will see 170 new residential units spread over one 6 story tower as well as 20 33 foot lots with 4 residential units per lot. If this is the case, please state what traffic calming measures will be implemented to address the inevitable increased volume of traffic on 18th and 19th Ave, affecting existing residents. The city has now blocked off 18th Avenue at Cambie street for a public plaza which has already has pushed more traffic onto 19th Ave. between Oak and Cambie. Nineteenth Ave. has become an extremely busy traffic thoroughfare through the residential neighbourhood of Douglas Park. Vehicles speed past a new dog park, existing tennis courts, a children’s playground, children walking to and from Edith Clavell School, people walking to Douglas Park Recreational Centre as well as a well used bike route. Nineteenth Ave. has parking on both sides of the street, is extremely narrow particularly between Heather and Ash streets making it severely congested and difficult to see at intersections. These are all issues with the current traffic load let alone an increase of at least 170 more vehicles daily from the new development. How will this be addressed to maintain livability and safety? Thank you for the opportunity to ask this question and for your response in advance.

    . asked 28 days ago

    Approximately 170 dwelling units are anticipated, consisting of 90 units in the 6‑storey rental building and 80 units within the multiplex components. The proposed development is required to comply with the updated Parking By-law with respect to off-street vehicle parking spaces  (with reduced parking minimums) and well-sited to encourage reduced vehicle trip and parking demand. It is in close proximity to the frequent transit network (Oak St) and cycling infrastructure (existing bikeway along Heather St). As part of the rezoning process, Engineering staff includes a review of the application with respect to transportation impacts and, if identified, may include development conditions for off-site requirements to improve transportation operations and safety for pedestrians, cyclists, and motorists adjacent to the site.

  • Share Please confirm that 1) the proposed rezoning would mean that there would be no requirement for childcare spaces; 2) no longer requiring childcare spaces would represent a change from the current zoning; 3) the proposed rezoning would mean that there would be no requirement for public open space; 4) no longer requiring public open space would represent a change from the current zoning; and 5) less than a year ago, the developer's Chief Development Officer stated that it was committed to a childcare facility and corner park improvements. on Facebook Share Please confirm that 1) the proposed rezoning would mean that there would be no requirement for childcare spaces; 2) no longer requiring childcare spaces would represent a change from the current zoning; 3) the proposed rezoning would mean that there would be no requirement for public open space; 4) no longer requiring public open space would represent a change from the current zoning; and 5) less than a year ago, the developer's Chief Development Officer stated that it was committed to a childcare facility and corner park improvements. on Twitter Share Please confirm that 1) the proposed rezoning would mean that there would be no requirement for childcare spaces; 2) no longer requiring childcare spaces would represent a change from the current zoning; 3) the proposed rezoning would mean that there would be no requirement for public open space; 4) no longer requiring public open space would represent a change from the current zoning; and 5) less than a year ago, the developer's Chief Development Officer stated that it was committed to a childcare facility and corner park improvements. on Linkedin Email Please confirm that 1) the proposed rezoning would mean that there would be no requirement for childcare spaces; 2) no longer requiring childcare spaces would represent a change from the current zoning; 3) the proposed rezoning would mean that there would be no requirement for public open space; 4) no longer requiring public open space would represent a change from the current zoning; and 5) less than a year ago, the developer's Chief Development Officer stated that it was committed to a childcare facility and corner park improvements. link

    Please confirm that 1) the proposed rezoning would mean that there would be no requirement for childcare spaces; 2) no longer requiring childcare spaces would represent a change from the current zoning; 3) the proposed rezoning would mean that there would be no requirement for public open space; 4) no longer requiring public open space would represent a change from the current zoning; and 5) less than a year ago, the developer's Chief Development Officer stated that it was committed to a childcare facility and corner park improvements.

    mago asked about 1 month ago

    1, The submitted rezoning application does not include a childcare facility. Zoning districts RR-2C and R1-1 does not require the provision of childcare. The rezoning enabling policy, the Cambie Corridor Plan, encourages the developer to explore integrating a childcare facility on the site. 

    2, The previously approved rezoning application included a childcare facility. The proposed rezoning represents a change from the current CD-1 zoning.

    3, The current application does not include dedicated public open space. The Cambie Corridor Plan speaks to public open space under section 6.3.11. 

    4, The previously approved rezoning application included public open space in the form of a corner park at 19th Avenue and Laurel Street. The proposed rezoning represents a change from the current CD-1 zoning.

    5, The corner park and childcare facility were in‑kind public benefits to be delivered as part of the CD‑1 development concept approved by Council in July 2022. In-kind public benefits are ultimately contingent on the viability of the proposal. The applicant has indicated that the project is no longer able to support the delivery of these public benefits as originally envisioned. Instead, the applicant is proceeding with an alternative approach to move the project forward.