Collingwood Park Renewal

Share on Facebook Share on Twitter Share on Linkedin Email this link

Consultation has concluded

Open lawn with playground in background and cherry blossom trees on the left and blue cloudy sky.


The Vancouver Park Board is currently in the planning stage for the renewal of Collingwood Park. Many of the features in the park are nearing the end of their lifespan and will need to be replaced or improved as part of the renewal. Potential features to be upgraded or replaced include the playground, sports court, wading pool, washrooms, paths, seating, and plantings.


What's happening?

A concept design for the park was developed based on community feedback gathered during a first round of consultation in May 2022. This report summarizes the feedback we received on the proposed concept during the second round of engagement in November/December 2022. Please see the Phase 2 Engagement Boards for the concept design and more information.

The Board approved the revised concept on March 27th 2023. We are now developing construction drawings based on the approved concept. When these drawings are complete we will be asking contractors to bid on constructing the project. Work is anticipated to begin in the spring of 2024.


The Vancouver Board of Parks and Recreation acknowledges, with respect, that our parks are located on the unceded territories of the Musqueam, Squamish, and Tsleil-Waututh peoples.

Translations

The automatic translation tool* is available for: Traditional Chinese [繁體中文] Simplified Chinese [简体中文] Punjabi [ਪੰਜਾਬੀ], Filipino [Tagalog], Vietnamese [Tiếng Việt], French [Français], Korean [한국어], Japanese [日本語] and Spanish [Español] – please see the tool at the top-right of this page.

*Note: the translation service on our website is hosted by Google Translate. As this is a third-party service, we cannot guarantee the quality or accuracy of any translated content.


The Vancouver Park Board is currently in the planning stage for the renewal of Collingwood Park. Many of the features in the park are nearing the end of their lifespan and will need to be replaced or improved as part of the renewal. Potential features to be upgraded or replaced include the playground, sports court, wading pool, washrooms, paths, seating, and plantings.


What's happening?

A concept design for the park was developed based on community feedback gathered during a first round of consultation in May 2022. This report summarizes the feedback we received on the proposed concept during the second round of engagement in November/December 2022. Please see the Phase 2 Engagement Boards for the concept design and more information.

The Board approved the revised concept on March 27th 2023. We are now developing construction drawings based on the approved concept. When these drawings are complete we will be asking contractors to bid on constructing the project. Work is anticipated to begin in the spring of 2024.


The Vancouver Board of Parks and Recreation acknowledges, with respect, that our parks are located on the unceded territories of the Musqueam, Squamish, and Tsleil-Waututh peoples.

Translations

The automatic translation tool* is available for: Traditional Chinese [繁體中文] Simplified Chinese [简体中文] Punjabi [ਪੰਜਾਬੀ], Filipino [Tagalog], Vietnamese [Tiếng Việt], French [Français], Korean [한국어], Japanese [日本語] and Spanish [Español] – please see the tool at the top-right of this page.

*Note: the translation service on our website is hosted by Google Translate. As this is a third-party service, we cannot guarantee the quality or accuracy of any translated content.

Consultation has concluded

We are happy to answer any questions you may have about the Collingwood Park Renewal.

Please send us a question and we will get back to you within 5 business days. If we think others may be interested in your question, we will post it here along with our response. Your email and personal information will remain private - only your question and username will be shared.

If you would like to share feedback anonymously, submit your comment here.

  • Share on Facebook Share on Twitter Share on Linkedin Email this link

    Fow how long the park is going to be closed? is it possible to do renovation NOT IN SUMMER? Summer is very busy time for kids in the park.

    Sergey asked over 1 year ago

    Length and time of construction will be determined in Spring 2023 after public consultation is complete and the concept plan is approved by the Park Board Commissioners. We do our best to minimize impacts to the park during construction and work with residents and stakeholders.