Search results
Results with proceed to site PROBLEMGO.COM pay for early release of family from jail South Dakota
Page 19 of 20. Found 198.
Q&A
As there is a significant slope from the rear lane to the front of the site, the mezzanine level is not considered to be a storey. While the uppermost floor does not contain any residential floor area, only a small indoor amenity space.
Q&A
To alleviate the expected traffic burden on Howe Street (south of Pacific Blvd.) resulting from the density of the proposed development, would converting Hornby Street (south of Pacific Blvd.) to a two-way street offer a practical and effective solution
2625 Oxford St (DP-2021-00759/ DP-2021-00760) development application
height of approximately 35 ft. for two-family dwelling25 ft. for infill dwellingA total Floor Space Ratio of 0.95 (approximately 3,900 sq. ft.)Two parking spaces provided having vehicular access from the laneUnder the site’s existing RS-1 zoning, the
Q&A
334 vehicle parking spaces and 630 bicycle parking spaces are proposed with parking access via the north-south lane to the west of the site from either West 18th Avenue or West 19th Avenue.
1065 Harwood St and 1332 Thurlow St rezoning application
The proposal is to allow for the development of a 33-storey residential building. The zoning would change from RM-5A (Residential) District to CD-1 (Comprehensive Development) District.
Q&A
Reducing the scale of the project (and therefore the number of new rental units that could be delivered) would impact viability and likely make it infeasible to proceed with construction.
Q&A
Since the proposed site is located on the edge of the sub-area, and there are several tall towers in close proximity to the subject site, the developer proposed a height above policy to offer more rental housing and more deeply affordable units while
East Park
The first phase of construction is anticipated to begin on the south side of the project site between the Seaside Greenway and East First Avenue in late 2026.
Q&A
and will proceed to construction of new housing.
Q&A
The ‘Trail Through the Forest’, which traverses across the site through the north and south parks, will be the defining feature of the park and open space network.