Portside Greenway

Share Portside Greenway on Facebook Share Portside Greenway on Twitter Share Portside Greenway on Linkedin Email Portside Greenway link
Photo of the proposed Portside Greenway car-free space on Wall Street between Cambridge and Oxford Street.

繁體中文 | 简体中文

We are upgrading the Portside Greenway, a 7 km route following the city’s northern edge, spanning between Gastown and the city’s eastern boundary. The goal is to create a high quality, continuous route that prioritizes safe, comfortable walking, biking and rolling with great spaces along the way.

Portside has been identified in many plans over the years, including the Greenways Plan (1995) (PDF, 7.6 MB), Transportation 2040 (2012) and the Vancouver Plan (2022). It also supports key civic priorities including equity and climate action.

Phase 3 Public Engagement - Wall Street segment has concluded:

Thank you to everyone who participated in our final phase of engagement on the Wall Street section of the Portside Greenway. In September 2025, we engaged the community on the Wall Street segment of the greenway through pop ups, door knocking, email, and a public survey. The engagement summary captures what we heard from residents and community organizations.

Read the Portside Greenway phase 3 engagement summary (PDF, 7.6 MB) to learn more about what we heard.

If you have questions, email portsidegreenway@vancouver.ca

Next steps:

Construction on Wall Street will be phased, beginning with the west zone where construction is planned to start in 2027. Construction on the central and east zones is planned to begin after 2028. We will provide an update to the community before this work begins.

There will be opportunities to help shape the design of the remaining Portside Greenway segments, including Alexander, Powell, and Bridgeway. Please sign up for our mailing list to stay updated.

繁體中文 | 简体中文

We are upgrading the Portside Greenway, a 7 km route following the city’s northern edge, spanning between Gastown and the city’s eastern boundary. The goal is to create a high quality, continuous route that prioritizes safe, comfortable walking, biking and rolling with great spaces along the way.

Portside has been identified in many plans over the years, including the Greenways Plan (1995) (PDF, 7.6 MB), Transportation 2040 (2012) and the Vancouver Plan (2022). It also supports key civic priorities including equity and climate action.

Phase 3 Public Engagement - Wall Street segment has concluded:

Thank you to everyone who participated in our final phase of engagement on the Wall Street section of the Portside Greenway. In September 2025, we engaged the community on the Wall Street segment of the greenway through pop ups, door knocking, email, and a public survey. The engagement summary captures what we heard from residents and community organizations.

Read the Portside Greenway phase 3 engagement summary (PDF, 7.6 MB) to learn more about what we heard.

If you have questions, email portsidegreenway@vancouver.ca

Next steps:

Construction on Wall Street will be phased, beginning with the west zone where construction is planned to start in 2027. Construction on the central and east zones is planned to begin after 2028. We will provide an update to the community before this work begins.

There will be opportunities to help shape the design of the remaining Portside Greenway segments, including Alexander, Powell, and Bridgeway. Please sign up for our mailing list to stay updated.

  • Phase 1 engagement

    Share Phase 1 engagement on Facebook Share Phase 1 engagement on Twitter Share Phase 1 engagement on Linkedin Email Phase 1 engagement link

    We want to hear from you!

    Phase 1 public engagement is now live. We want to learn more about how you use the greenway today, along with any ideas or concerns you have.

    1. View the information boards (PDF, 20.6 MB) to learn more about the project:
    2. Take our survey by May 25, 2023.
    3. Visit one of our open houses at the following dates and locations:

    Next steps

    Your input will help us develop design concepts that we'll share later this year. An engagement summary will be published and shared with community members this summer.

  • 繁體中文 - TCH

    Share 繁體中文 - TCH on Facebook Share 繁體中文 - TCH on Twitter Share 繁體中文 - TCH on Linkedin Email 繁體中文 - TCH link

    我們正在提升港畔綠色通道,目的在於創建一個高質素而連貫的路線,並且優先關注提供安全舒適的地方,供步行、騎單車和滑動工具使用,沿途會設有美好的公共空間。我們想知道您目前如何使用這條綠色通道,並且有沒有任何想法和關注事項。


    請參加以下其中一個開放日,分享您對這個項目的想法,並提出反饋 (只提供英語):





    我們會設有一項意見調查,以收集您目前如何使用該綠色通道的反饋,並且您對該地區有沒有任何想法和關注事項。 只提供英語 可使用在頁面頂部提供的自動翻譯


    您也可以通過電話用中文分享意見,請在2023525日前撥打:3-1-1,您將會聽到一個自動語音訊息,請繼續留在電話線上,等待與工作人員通話,然後告知您想選用哪種語言溝通。


    您也可以通過電子郵箱,用中文提出反饋,電子郵箱地址:portsidegreenway@vancouver.ca

Page last updated: 30 Mar 2026, 02:01 PM