Search results
Results with check site MAKEMUR.com Buying an early release from jail loophole Karnet Prison Farm
Page 10 of 20. Found 196.
2672 Cambridge St (DP-2022-00884) development application
Space Ratio of 0.85 for the site (approximately 3,890 sq. ft.)Two vehicle parking spaces, having access from the laneUnder the site’s existing RS-1 zoning, the application is “conditional” so it may be permitted.
Q&A
This area would benefit from an elementary school and/or pre-school. Has there been consideration for this?
Tenant First Approach
BC Housing is committed to an inclusive, tenant-first approach to undertaking the planning program and eventual redevelopment of Skeena Terrace.
5098 James St (DP-2020-00442 - Little Mountain Building EB) development application
Holborn Properties Ltd. has applied to the City of Vancouver for permission to develop this site, consisting of:A six-storey multiple dwelling, containing 87 units;With an approximate height of 17.7 m (58 ft.)
1837 E 11th Ave and 2631 Victoria Dr rezoning application
Staff are aware of this issue and an updated mailer has been circulated.Please note: This is a new rezoning application for this site.
575 W 20th Ave (DP-2023-00332) development application
Lanefab Design and Build Ltd. has applied to the City of Vancouver for permission to retain the existing heritage single detached house (Building 1) and to develop an infill single detached house (Building 2) at the rear of this site, consisting of:A
3136 W 8th Ave (DP-2023-00232) development application
Kerr Design Build has applied to the City of Vancouver for permission to perform additions/alterations to the existing Single Detached House and to develop an Infill Single Detached House (Building 2) on the south portion of the site, consisting of:A
2025 Fall-Winter Engagement
Early policy directions and ideas, informed by community input and technical analysis, will be shared early 2026. Sign up for project updates and to stay informed as the process moves forward.
Have you spoken to businesses on Davie Street?
For businesses specifically, we: heard from 50+ businesses between Burrard and Jervis Streets through our business survey in May 2023;hosted a business & community organization workshop in June 2023;discussed early design ideas with 25 businesses
Q&A
The release rate from this tank will be controlled by an orifice and overflow pipe module proceeding tie-in to the City storm sewer.