Search results
Results with MAKEMUR.COM fix things with the police so they let me go from the station
Page 12 of 20. Found 196.
Q&A
However, if what is described above can be achieved and is acceptable to staff, we would go ahead and delete P5.The applicant states: DEVELOPMENT IS INTENDED TO MARRY THE SCALES OF THE WEST END HIGH RISES, WITH THE SMALLER SCALE CHARACTER OF THE HERITAGE
Q&A
With construction machinery going through, if damage incurred during construction, will the developer fix the alley way? How do they make sure people do not use the alley as a parking lot in the future?
January 2025 – Engagement on Updates to the Draft Plan
Updates to the draft Rupert and Renfrew Station Area Plan are now available. These updates incorporate feedback from previous engagement, as well as results from additional economic testing and technical studies.
What is the scope of this project?
Although the City works closely with Vancouver Police Department, Vancouver Parks Board, Vancouver Public Library, Vancouver Coastal Health, and other agencies, we cannot make decisions on their behalf and have limited control over their operations.
Q&A
The subject site at 5027–5053 Boundary Road is approximately 1,555 metres from Joyce–Collingwood Station — a 20-minute walk. The TOA tiers extend to a maximum of 800 m from a SkyTrain station (Tier 3).
Q&A
You informed me that its area is 25 797 ft.² but the CBC reported that it was 33,000 ft.² (0.31 ha) and the reporter says he got that area in a statement from the school board. .No plans are available nor required for this rezoning to a district schedule
3200 East Broadway enhanced rezoning proposal
Aquilini Development, seek to rezone the site from I-2 to CD-1.
4975-4997 Joyce St rezoning application
height of 117.0 m (384 ft.) with additional height for rooftop amenity space.This application is being considered under the Joyce-Collingwood Station Precinct Plan.
Q&A
They are generated with the intention that they will serve the investments needed from development-related population growth.
November 2025: Phase 2 engagement launches
Building on what we heard in Phase 1, we are sharing ideas and draft land use plans for the Villages, showing where things like apartment buildings, shops and services could go.