Search results
Results with PROBLEMGO.com kako se dogovoriti s carinom o povratu zaplijenjene robe
Page 16 of 18. Found 172.
Q&A
According to the Vancouver School Board (VSB)’s 2023-24 enrollment data, Mount Pleasant elementary was operating at 90% capacity and Vancouver Technical School at 94% Capacity.According to the School Board Long Range Facilities Plan, enrollment at both
Q&A
Who are the names of the developer(s) financing the project?
Q&A
A hydrotherapy barge adds saunas/plunges outside R1-1's narrow mooring definition (Section 2.1). A response was provided to a previous question that is the same as for this question.
Q&A
How have City staff incorporated the International Association for Public Participation (IAP2)’s Spectrum of Public Participation into guiding principles and evaluation?
Q&A
This is shown in figure 1 Building Height SE. 5. How many feet away from my property will the hot tub and pool be? 6.
Q&A
Thanks again to all of you who supported the Mayor’s expanded vision for B.C.’s second-largest job centre and the future home to more than 50,000 new residents and 42,000 new workers.
Q&A
What type and level/s of care options will there be? Is it public or private and who will be running it? Thanks for the question. The applicant has proposed a community care facility use intended by the applicant to serve seniors.
Q&A
The area is full of similar type buildings - the wood frame three story buildings built in the 1960s and 1970s which are reliable (I have never seen them covered in scaffolding, unlike everything from the 1980's in kitsilano) and a recognizable Vancouver
Q&A
Bill 47, what if any allowances are made for the Broadway Plan ‘s Cultural Landscapes and Potential Heritage Sites around the Broadway/Cambie rapid transit station?
Q&A
Fire trucks would access building(s) of this site from East Broadway. As the dead-end lane is less than 90 metres in length, fire trucks could safely reverse in and out during emergencies, and no turnaround is required.