Search results
Results with PROBLEMGO.com hire a hacker to remove my case from the court database
Page 4 of 20. Found 197.
852 E Georgia St (DP-2022-00812) development application
32 ft.A total Floor Space Ratio of: 0.85 (approximately 2,584 sq. ft.)To remove and replace the existing two-car garage in the rear having vehicular access from the laneA total height of approximately 15 ft.Under the site’s existing RT-3 zoning, the
Q&A
Now that the Canada Line is complete, the City reviews new development proposals on a case-by-case basis and would only engage with TransLink if, from a transportation perspective, additional infrastructure was deemed feasible and desired as part of that
Moberly Park Area Traffic Calming Survey
(select all that apply)Note: These categories are from the Canadian Census. Residents of Vancouver and those connected to the city in other ways come from many different ethnic and racial backgrounds.
Q&A
Will that still be the case now that Rolston will be extended to intersect Pacific from the North?
Q&A
Integration of teams and technologies is essential to being an innovator and building a sustainable anchor company. My questions are for the Planning Department.
Application to revise rezoning in advance of enactment
This conversion corresponds to a reduction in the offered cash CAC which is converted to in-kind CAC in the form of social housing. As a result, the total number of market rental housing units would decrease from 129 to 78.
Q&A
The accessible parking stall has been located at grade to remove the need for commercial elevator access from the parkade. This configuration will be reviewed by engineering staff.
Who is the MST Partnership?
The MST Partnership is a partnership between the three local First Nations of the Musqueam Indian Band, Squamish Nation, and Tsleil-Waututh Nation.In the case of the Jericho Lands, the MST Partnership is represented by the MST Development Corporation
density to accommodate more social housing
, The proposed changes to the rezoning policy for the Downtown Eastside Oppenheimer District (sub areas 2, 3, 4) would allow additional density & height to be considered on a case-by-case basis for 100% social housing, depending on heritage considerations
Why are you renewing Collingwood Park?
Features to be upgraded or replaced include the playground, sports court, wading pool, pathways, field drainage and planting.