West Side Primary Path
The proposed primary path on the west side of the bridge includes: (1) a wide and accessible sidewalk (typical 4.2m), with room for furniture along the way; (2) a wide two-way bike path (typical 4.2m) between the sidewalk and traffic lanes, with room for passing in each direction; (3) a protective barrier between the bike path and motor vehicle lane; and (4) redesigned intersections with signals at the Howe and Fir ramps, to make them safe, accessible, and comfortable to cross.